Morning briefing — free market intel before the open

Prospector Metals Corp. (PPP)

Au intercept — ML31 at ML Project

Company
Prospector Metals Corp.
Ticker
PPP
Property
ML Project
Metal
Au
Hole ID
ML31
Width
44 m
Grade
13.79 g/t
Gram-metres
606.76 g·m
Value per tonne (live spot)
$2,372
Precious-metal value (nugget)
$2,106 (89% of value)
Residual value (net, est.)
$2,082
Jurisdiction
Unknown, Unknown

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.