Morning briefing — free market intel before the open

Ashley Gold Corp (ASHL)

Au intercept — TAK-02-06 at Tak

Company
Ashley Gold Corp
Ticker
ASHL
Property
Tak
Metal
Au
Hole ID
TAK-02-06
Interval
81.3–82.4 m
Width
1.1 m
Grade
7 g/t
Gram-metres
7.7 g·m
Value per tonne (live spot)
$1,022
Precious-metal value (nugget)
$1,022 (100% of value)
Residual value (net, est.)
$880
Jurisdiction
MISSING — not recoverable from snippet

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.