Morning briefing — free market intel before the open

Ridgeline Minerals Corp. (RDG)

Au intercept — SW22-002 at Swift

Company
Ridgeline Minerals Corp.
Ticker
RDG
Property
Swift
Metal
Au
Hole ID
SW22-002
Width
37.2 m
Grade
0.29 g/t
Gram-metres
10.79 g·m
Value per tonne (live spot)
$49
Precious-metal value (nugget)
$49 (100% of value)
Residual value (net, est.)
$4
Jurisdiction
MISSING — unconfirmed from snippet

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.