Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from AZM · WS26-100 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$289.37
across 1.0 metres
Nugget — precious-metal value
$24.66 /t
9% of total value · base metals $264.71/t
Residual — net realizable value
$220.43 /t
gross $289.37 → recovered $260.43 − cost $40.00
Au
8.5%$24.66/t
Sb
91.5%$264.71/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.26 g/t$24.663.051 g/t3.1
Silver$0.00268.670 g/t268.7
Platinum$0.009.137 g/t9.1
Palladium$0.009.279 g/t9.3
Rhodium$0.000.902 g/t0.9
Copper$0.002.823 %2.8
Zinc$0.0010.254 %10.3
Nickel$0.001.762 %1.8
Lead$0.0013.394 %13.4
Antimony1.19 %$264.711.301 %1.3
Tungsten$0.000.081 %0.1
Lithium$0.001.050 %1.1
Tin$0.000.637 %0.6
Cobalt$0.000.831 %0.8
Molybdenum$0.000.656 %0.7
Uranium$0.000.153 %0.2
Iron Ore$0.00260.038 %260.0
Gallium$0.001,020.168 g/t1,020.2
Total$289.37

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.