Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from GFG · NAH-26-004 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$83.46
across 1.3 metres
Nugget — precious-metal value
$83.46 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$35.12 /t
gross $83.46 → recovered $75.12 − cost $40.00
Au
100.0%$83.46/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.88 g/t$83.460.880 g/t1.1
Silver$0.0077.493 g/t100.7
Platinum$0.002.636 g/t3.4
Palladium$0.002.676 g/t3.5
Rhodium$0.000.260 g/t0.3
Copper$0.000.814 %1.1
Zinc$0.002.958 %3.8
Nickel$0.000.508 %0.7
Lead$0.003.863 %5.0
Antimony$0.000.375 %0.5
Tungsten$0.000.023 %0.0
Lithium$0.000.303 %0.4
Tin$0.000.184 %0.2
Cobalt$0.000.240 %0.3
Molybdenum$0.000.189 %0.2
Uranium$0.000.044 %0.1
Iron Ore$0.0075.003 %97.5
Gallium$0.00294.247 g/t382.5
Total$83.46

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.