Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from SGN · 26MN-077 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$192.53
across 1.9 metres
Nugget — precious-metal value
$192.53 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$133.28 /t
gross $192.53 → recovered $173.28 − cost $40.00
Au
100.0%$192.53/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold2.03 g/t$192.532.030 g/t3.8
Silver$0.00178.761 g/t337.9
Platinum$0.006.080 g/t11.5
Palladium$0.006.174 g/t11.7
Rhodium$0.000.600 g/t1.1
Copper$0.001.878 %3.5
Zinc$0.006.823 %12.9
Nickel$0.001.172 %2.2
Lead$0.008.911 %16.8
Antimony$0.000.866 %1.6
Tungsten$0.000.054 %0.1
Lithium$0.000.699 %1.3
Tin$0.000.424 %0.8
Cobalt$0.000.553 %1.0
Molybdenum$0.000.437 %0.8
Uranium$0.000.101 %0.2
Iron Ore$0.00173.018 %327.0
Gallium$0.00678.775 g/t1,282.9
Total$192.53

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.