Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from GQC · LTP-171 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$855.07
across 3.6 metres
Nugget — precious-metal value
$803.81 /t
94% of total value · base metals $51.26/t
Residual — net realizable value
$729.56 /t
gross $855.07 → recovered $769.56 − cost $40.00
Au
92.2%$788.16/t
Ag
1.8%$15.65/t
Cu
6.0%$51.26/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold8.31 g/t$788.169.015 g/t32.0
Silver14.53 g/t$15.65793.897 g/t2,818.3
Platinum$0.0027.001 g/t95.9
Palladium$0.0027.418 g/t97.3
Rhodium$0.002.666 g/t9.5
Copper0.5 %$51.268.341 %29.6
Zinc$0.0030.301 %107.6
Nickel$0.005.206 %18.5
Lead$0.0039.577 %140.5
Antimony$0.003.844 %13.6
Tungsten$0.000.240 %0.9
Lithium$0.003.103 %11.0
Tin$0.001.882 %6.7
Cobalt$0.002.455 %8.7
Molybdenum$0.001.939 %6.9
Uranium$0.000.451 %1.6
Iron Ore$0.00768.391 %2,727.8
Gallium$0.003,014.510 g/t10,701.5
Total$855.07

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.