Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from NAU · LBS26-018 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$100.84
across 14.9 metres
Nugget — precious-metal value
$40.78 /t
40% of total value · base metals $60.06/t
Residual — net realizable value
$50.76 /t
gross $100.84 → recovered $90.76 − cost $40.00
Au
40.4%$40.78/t
Sb
59.6%$60.06/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.43 g/t$40.781.063 g/t15.8
Silver$0.0093.630 g/t1,395.1
Platinum$0.003.184 g/t47.4
Palladium$0.003.234 g/t48.2
Rhodium$0.000.314 g/t4.7
Copper$0.000.984 %14.7
Zinc$0.003.574 %53.2
Nickel$0.000.614 %9.1
Lead$0.004.668 %69.5
Antimony0.27 %$60.060.453 %6.8
Tungsten$0.000.028 %0.4
Lithium$0.000.366 %5.5
Tin$0.000.222 %3.3
Cobalt$0.000.290 %4.3
Molybdenum$0.000.229 %3.4
Uranium$0.000.053 %0.8
Iron Ore$0.0090.622 %1,350.3
Gallium$0.00355.521 g/t5,297.3
Total$100.84

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.