Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from TUNG · AT26-15 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$3,427.20
across 0.1 metres
Nugget — precious-metal value
$0.00 /t
0% of total value · base metals $3,427.20/t
Residual — net realizable value
$3,044.48 /t
gross $3,427.20 → recovered $3,084.48 − cost $40.00
W
100.0%$3,427.20/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold$0.0036.135 g/t4.0
Silver$0.003,182.027 g/t350.0
Platinum$0.00108.221 g/t11.9
Palladium$0.00109.895 g/t12.1
Rhodium$0.0010.687 g/t1.2
Copper$0.0033.431 %3.7
Zinc$0.00121.450 %13.4
Nickel$0.0020.866 %2.3
Lead$0.00158.628 %17.4
Antimony$0.0015.407 %1.7
Tungsten0.96 %$3,427.200.960 %0.1
Lithium$0.0012.436 %1.4
Tin$0.007.543 %0.8
Cobalt$0.009.839 %1.1
Molybdenum$0.007.773 %0.9
Uranium$0.001.807 %0.2
Iron Ore$0.003,079.799 %338.8
Gallium$0.0012,082.496 g/t1,329.1
Total$3,427.20

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.