Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from PAAS · BC1495-5934D drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$504.57
across 5.9 metres
Nugget — precious-metal value
$504.57 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$414.12 /t
gross $504.57 → recovered $454.12 − cost $40.00
Au
100.0%$504.57/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold5.32 g/t$504.575.320 g/t31.4
Silver$0.00468.478 g/t2,764.0
Platinum$0.0015.933 g/t94.0
Palladium$0.0016.179 g/t95.5
Rhodium$0.001.573 g/t9.3
Copper$0.004.922 %29.0
Zinc$0.0017.881 %105.5
Nickel$0.003.072 %18.1
Lead$0.0023.354 %137.8
Antimony$0.002.268 %13.4
Tungsten$0.000.141 %0.8
Lithium$0.001.831 %10.8
Tin$0.001.110 %6.6
Cobalt$0.001.449 %8.5
Molybdenum$0.001.144 %6.8
Uranium$0.000.266 %1.6
Iron Ore$0.00453.427 %2,675.2
Gallium$0.001,778.859 g/t10,495.3
Total$504.57

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat