Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from ARIC · OEDD-159 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$455.25
across 4.0 metres
Nugget — precious-metal value
$455.25 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$369.73 /t
gross $455.25 → recovered $409.73 − cost $40.00
Au
100.0%$455.25/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold4.8 g/t$455.254.800 g/t19.2
Silver$0.00422.687 g/t1,690.7
Platinum$0.0014.376 g/t57.5
Palladium$0.0014.598 g/t58.4
Rhodium$0.001.420 g/t5.7
Copper$0.004.441 %17.8
Zinc$0.0016.133 %64.5
Nickel$0.002.772 %11.1
Lead$0.0021.071 %84.3
Antimony$0.002.047 %8.2
Tungsten$0.000.128 %0.5
Lithium$0.001.652 %6.6
Tin$0.001.002 %4.0
Cobalt$0.001.307 %5.2
Molybdenum$0.001.033 %4.1
Uranium$0.000.240 %1.0
Iron Ore$0.00409.107 %1,636.4
Gallium$0.001,604.986 g/t6,419.9
Total$455.25

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat