Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from ARIC · CHDD-02 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$1,005.35
across 7.0 metres
Nugget — precious-metal value
$1,005.35 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$864.82 /t
gross $1,005.35 → recovered $904.82 − cost $40.00
Au
100.0%$1,005.35/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold10.6 g/t$1,005.3510.600 g/t74.2
Silver$0.00933.433 g/t6,534.0
Platinum$0.0031.746 g/t222.2
Palladium$0.0032.237 g/t225.7
Rhodium$0.003.135 g/t21.9
Copper$0.009.807 %68.6
Zinc$0.0035.627 %249.4
Nickel$0.006.121 %42.8
Lead$0.0046.533 %325.7
Antimony$0.004.520 %31.6
Tungsten$0.000.282 %2.0
Lithium$0.003.648 %25.5
Tin$0.002.213 %15.5
Cobalt$0.002.886 %20.2
Molybdenum$0.002.280 %16.0
Uranium$0.000.530 %3.7
Iron Ore$0.00903.445 %6,324.1
Gallium$0.003,544.344 g/t24,810.4
Total$1,005.35

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat