Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from ARIC · CHDD-10 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$872.57
across 5.0 metres
Nugget — precious-metal value
$872.57 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$745.31 /t
gross $872.57 → recovered $785.31 − cost $40.00
Au
100.0%$872.57/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold9.2 g/t$872.579.200 g/t46.0
Silver$0.00810.149 g/t4,050.7
Platinum$0.0027.553 g/t137.8
Palladium$0.0027.979 g/t139.9
Rhodium$0.002.721 g/t13.6
Copper$0.008.512 %42.6
Zinc$0.0030.921 %154.6
Nickel$0.005.313 %26.6
Lead$0.0040.387 %201.9
Antimony$0.003.923 %19.6
Tungsten$0.000.244 %1.2
Lithium$0.003.166 %15.8
Tin$0.001.920 %9.6
Cobalt$0.002.505 %12.5
Molybdenum$0.001.979 %9.9
Uranium$0.000.460 %2.3
Iron Ore$0.00784.122 %3,920.6
Gallium$0.003,076.223 g/t15,381.1
Total$872.57

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat