Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from SLA · ND26-013B drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$129.90
across 13.4 metres
Nugget — precious-metal value
$82.44 /t
63% of total value · base metals $47.47/t
Residual — net realizable value
$76.91 /t
gross $129.90 → recovered $116.91 − cost $40.00
Au
24.8%$32.25/t
Ag
38.6%$50.19/t
Zn
31.7%$41.20/t
Pb
4.8%$6.27/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.34 g/t$32.251.370 g/t18.4
Silver46.6 g/t$50.19120.610 g/t1,616.2
Platinum$0.004.102 g/t55.0
Palladium$0.004.165 g/t55.8
Rhodium$0.000.405 g/t5.4
Copper$0.001.267 %17.0
Zinc1.46 %$41.204.603 %61.7
Nickel$0.000.791 %10.6
Lead0.29 %$6.276.013 %80.6
Antimony$0.000.584 %7.8
Tungsten$0.000.036 %0.5
Lithium$0.000.471 %6.3
Tin$0.000.286 %3.8
Cobalt$0.000.373 %5.0
Molybdenum$0.000.295 %3.9
Uranium$0.000.068 %0.9
Iron Ore$0.00116.735 %1,564.3
Gallium$0.00457.970 g/t6,136.8
Total$129.90

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat