Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from TOC · JES-26-134 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$169.19
across 3.1 metres
Nugget — precious-metal value
$169.19 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$112.27 /t
gross $169.19 → recovered $152.27 − cost $40.00
Au
84.1%$142.27/t
Ag
15.9%$26.93/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold1.5 g/t$142.271.784 g/t5.4
Silver25 g/t$26.93157.090 g/t479.1
Platinum$0.005.343 g/t16.3
Palladium$0.005.425 g/t16.5
Rhodium$0.000.528 g/t1.6
Copper$0.001.650 %5.0
Zinc$0.005.996 %18.3
Nickel$0.001.030 %3.1
Lead$0.007.831 %23.9
Antimony$0.000.761 %2.3
Tungsten$0.000.047 %0.1
Lithium$0.000.614 %1.9
Tin$0.000.372 %1.1
Cobalt$0.000.486 %1.5
Molybdenum$0.000.384 %1.2
Uranium$0.000.089 %0.3
Iron Ore$0.00152.043 %463.7
Gallium$0.00596.486 g/t1,819.3
Total$169.19

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat