Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from TOC · JES-26-142 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$38.98
across 3.1 metres
Nugget — precious-metal value
$38.98 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$0.00 /t
gross $38.98 → recovered $35.08 − cost $40.00
Au
94.9%$36.99/t
Ag
5.1%$1.99/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.39 g/t$36.990.411 g/t1.3
Silver1.85 g/t$1.9936.193 g/t110.4
Platinum$0.001.231 g/t3.8
Palladium$0.001.250 g/t3.8
Rhodium$0.000.122 g/t0.4
Copper$0.000.380 %1.2
Zinc$0.001.381 %4.2
Nickel$0.000.237 %0.7
Lead$0.001.804 %5.5
Antimony$0.000.175 %0.5
Tungsten$0.000.011 %0.0
Lithium$0.000.141 %0.4
Tin$0.000.086 %0.3
Cobalt$0.000.112 %0.3
Molybdenum$0.000.088 %0.3
Uranium$0.000.021 %0.1
Iron Ore$0.0035.031 %106.8
Gallium$0.00137.430 g/t419.2
Total$38.98

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat