Morning briefing — free market intel before the open

DPM METALS INC (DPM)

AuEq intercept — EX_WZD_165_05A at Chelopech

Company
DPM METALS INC
Ticker
DPM
Property
Chelopech
Metal
AuEq
Hole ID
EX_WZD_165_05A
Interval
763–768 m
Width
5 m
Grade
4.49 g/t
Gram-metres
22.45 g·m
Value per tonne (live spot)
$660
Precious-metal value (nugget)
$653 (99% of value)
Residual value (net, est.)
$554
Jurisdiction
Sofia Province, Bulgaria

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.