SURG.V
Surge Copper Corp.Loading price…
Loading price…
Pre-feasibility study (PFS) · effective 2026-06-11
As disclosed by the company in its NI 43-101 technical report (effective 2026-06-11). Economic-study estimates are forward-looking and subject to the assumptions and risks in the original report; verify against the filing before drawing conclusions.
Pre-feasibility study (PFS) · effective 2026-06-11
As disclosed by the company in its NI 43-101 technical report (effective 2026-06-11). Economic-study estimates are forward-looking and subject to the assumptions and risks in the original report; verify against the filing before drawing conclusions.