Skip to content
Morning briefing — free market intel before the open
Drill dossier

K2 Gold Corporation (KTO)

Au intercept at Mojave Project

Announced 2026-06-25

Company
K2 Gold Corporation
Ticker
KTO
Property
Mojave Project
Metal
Au
Program type
Discovery
Interval
0–86.9 m
Width
86.9 m
Grade
4 g/t
Gram-metres
347.6 g·m
Value per tonne (live spot)
$539.36
Precious-metal value (nugget)
$539 (100% of value)
Residual value (net, est.)
$445

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat