Morning briefing — free market intel before the open

55 North Mining Inc. (FFF)

Au intercept — LH26-07 at Last Hope Gold Deposit

Announced 2026-07-07

Company
55 North Mining Inc.
Ticker
FFF
Property
Last Hope Gold Deposit
Metal
Au
Program type
Step-out
Hole ID
LH26-07
Interval
218–219 m
Width
1 m
Grade
13.6 g/t
Gram-metres
13.6 g·m
Value per tonne (live spot)
$1,816.95
Precious-metal value (nugget)
$1,817 (100% of value)
Residual value (net, est.)
$1,595
Jurisdiction
Unknown, unconfirmed — not present in source text

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat