Morning briefing — free market intel before the open

Edge Copper Corporation (EDCU)

Cu intercept — ZND0049 at Zonia

Announced 2026-07-08

Company
Edge Copper Corporation
Ticker
EDCU
Property
Zonia
Metal
Cu
Program type
Infill
Hole ID
ZND0049
Interval
0–168.9 m
Width
168.9 m
Grade
0.27 %
Gram-metres
45.6 g·m
Value per tonne (live spot)
$36.29
Precious-metal value (nugget)
$0 (0% of value)
Residual value (net, est.)
$0
Jurisdiction
Arizona, United States

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat