Morning briefing — free market intel before the open

Talisker Resources Ltd. (TSK)

Au intercept — M1045_BK9870_OD_E1_F4 at Bralorne Gold Project - Mustang Mine

Announced 2026-07-21

Company
Talisker Resources Ltd.
Ticker
TSK
Property
Bralorne Gold Project - Mustang Mine
Metal
Au
Hole ID
M1045_BK9870_OD_E1_F4
Interval
1.34–1.83 m
Width
0.49 m
Grade
89.3 g/t
Gram-metres
43.76 g·m
Value per tonne (live spot)
$11,725.41
Precious-metal value (nugget)
$11,725 (100% of value)
Residual value (net, est.)
$10,513

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat