Skip to content
Morning briefing — free market intel before the open
Drill dossier

Lundin Gold (LUG)

Au intercept — FDNE-2026-466-D2 at FDN East

Announced 2026-07-27

Live spot prices are temporarily unavailable — dollar-per-tonne values are computed from reference prices and may be out of date.
Company
Lundin Gold
Ticker
LUG
Property
FDN East
Metal
Au
Hole ID
FDNE-2026-466-D2
Interval
429.05–435.3 m
Width
6.25 m
Grade
23.16 g/t
Gram-metres
144.75 g·m
Value per tonne (reference prices)
$3,040.77
Jurisdiction
Ecuador

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat