Drill dossier
Gold X2 Mining Inc. (AUXX)
Au intercept — MMD-26-381 at Moss Gold Project
Announced 2026-08-18
- Company
- Gold X2 Mining Inc.
- Ticker
- AUXX
- Property
- Moss Gold Project
- Metal
- Au
- Program type
- Infill
- Hole ID
- MMD-26-381
- Interval
- 297–303.2 m
- Width
- 6.2 m
- Grade
- 1.33 g/t
- Gram-metres
- 8.25 g·m
- Value per tonne (live spot)
- $185.38