Drill dossier
Troilus Mining Corp. (TLG)
AuEq intercept — J-26-350 at Troilus Project
Announced 2026-08-19
- Company
- Troilus Mining Corp.
- Ticker
- TLG
- Property
- Troilus Project
- Metal
- AuEq
- Hole ID
- J-26-350
- Interval
- 114.5–126 m
- Width
- 11.5 m
- Grade
- 0.62 g/t
- Gram-metres
- 7.13 g·m
- Value per tonne (live spot)
- $76.13
- Precious-metal value (nugget)
- $55 (72% of value)