Drill dossier
Urbana Corporation (URB)
Au intercept — UU-25-13 at Urban Township Project
Announced 2026-09-18
- Company
- Urbana Corporation
- Ticker
- URB
- Property
- Urban Township Project
- Metal
- Au
- Hole ID
- UU-25-13
- Interval
- 243.5–247.6 m
- Width
- 4.1 m
- Grade
- 0.4 g/t
- Gram-metres
- 1.64 g·m
- Value per tonne (live spot)
- $56.27
- Precious-metal value (nugget)
- $56 (100% of value)

