Morning briefing — free market intel before the open

Stillwater Critical Minerals Corp. (PGE)

Rh intercept — CM2025-01 at Stillwater West

Company
Stillwater Critical Minerals Corp.
Ticker
PGE
Property
Stillwater West
Metal
Rh
Hole ID
CM2025-01
Interval
358–359.22 m
Width
1.22 m
Grade
0.17 g/t
Gram-metres
0.21 g·m
Value per tonne (live spot)
$48
Precious-metal value (nugget)
$48 (100% of value)
Residual value (net, est.)
$3
Jurisdiction
Montana, USA (inferred if Stillwater West is correct, but unconfirmed)

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.