Morning briefing — free market intel before the open

Hemlo Mining Corp. (HMMC)

Au intercept — 7652604 at South-Rim Zone

Company
Hemlo Mining Corp.
Ticker
HMMC
Property
South-Rim Zone
Metal
Au
Hole ID
7652604
Width
4.8 m
Grade
6.04 g/t
Gram-metres
28.99 g·m
Value per tonne (live spot)
$882
Precious-metal value (nugget)
$882 (100% of value)
Residual value (net, est.)
$754

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.