Morning briefing — free market intel before the open

1911 Gold Corporation (AUMB)

Au intercept — UG16-26-055 at True North Gold Project

Announced 2026-05-22

Company
1911 Gold Corporation
Ticker
AUMB
Property
True North Gold Project
Metal
Au
Program type
Step-out
Hole ID
UG16-26-055
Width
3.7 m
Grade
11.54 g/t
Gram-metres
42.7 g·m
Value per tonne (live spot)
$1,491.28
Precious-metal value (nugget)
$1,491 (100% of value)
Residual value (net, est.)
$1,302
Jurisdiction
Manitoba, Canada

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat