Skip to content
Morning briefing — free market intel before the open
Drill dossier

Awale Resources Limited (ARIC)

Au intercept — CHDD-24 at Charger 2

Announced 2026-06-03

Live spot prices are temporarily unavailable — dollar-per-tonne values are computed from reference prices and may be out of date.
Company
Awale Resources Limited
Ticker
ARIC
Property
Charger 2
Metal
Au
Hole ID
CHDD-24
Interval
144–162 m
Width
18 m
Grade
9.2 g/t
Gram-metres
165.6 g·m
Value per tonne (reference prices)
$1,226.08
Precious-metal value (nugget)
$1,226 (100% of value)
Residual value (net, est.)
$1,063

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat