Morning briefing — free market intel before the open

Camino Minerals Corporation (COR)

Cu intercept — DCH-133 at Costa de Cobre

Announced 2026-06-10

Company
Camino Minerals Corporation
Ticker
COR
Property
Costa de Cobre
Metal
Cu
Program type
Step-out
Hole ID
DCH-133
Interval
89.5–165.7 m
Width
76.2 m
Grade
0.88 %
Gram-metres
67.06 g·m
Value per tonne (live spot)
$130.48
Precious-metal value (nugget)
$5 (4% of value)
Residual value (net, est.)
$71
Jurisdiction
MISSING — unconfirmed from snippet

Value per tonne is the gross in-situ rock value at today's spot prices, before recovery, mining, processing, royalties, or metallurgy — recomputed live on every page load. The nugget is the share of that value from precious metals (gold, silver, platinum, palladium, rhodium). Residual value estimates the net realizable value after recovery and operating cost — it assumes 90% recovery for precious metals, 85% for base metals, and $40/t operating cost; model your own assumptions in the calculator. Informational only; read the original NI 43-101 or JORC filing before drawing conclusions.

Chat