P2 Gold Intersects 183.0 g/t Gold and 4.0% Copper Over 1.52 Meters at Lucky Strike Zone
News provided by P2 Gold Inc. May 20, 2026, 05:00 ET Share this article Share to X Share this article Share to X VANCOUVER, BC , May 20, 2026 /CNW/ - P2 Gold Inc. ("P2" or the "Company") (TSXV: PGLD ) (OTCQB: PGLDF) reports results from four diamond drill holes (GBD-021 and GBD-029 to 031) drilled at the Lucky Strike Zone as part of the Infill and Expansion Drill Program at its Gabbs Project located on the Walker-Lane Trend in Nevada. Visible gold was encountered in drill hole GBD-021, a 100-meter step out to the south into an area with no historical drilling. Results from drilling to date confirm the Lucky Strike Zone continues to host high potential for expansion.
Drilling Highlights Continue Reading Lucky Strike Plan View May 20, 2026 (CNW Group/P2 Gold Inc.) Lucky Strike Section FF-FF' May 20, 2026 (CNW Group/P2 Gold Inc.) Lucky Strike Section QQ-QQ' May 20, 2026 (CNW Group/P2 Gold Inc.) Select drill results (see Table 1 below for drill results) from holes GBD-021 and GBD-029 to 031 drilled at the Lucky Strike Zone include: Hole GBD-021 intersected 1.04 g/t gold and 0.35% copper over 53.34 meters from 60.96 meters downhole (1 sample capped at 7 g/t gold and 3 samples capped at 0.7% copper) , including 19.81 meters grading 1.93 g/t gold and 0.44% copper starting 65.53 meters downhole (1 sample capped at 7 g/t gold and 2 samples capped at 0.7% copper) and including 1.52 meters grading 183.0 g/t gold and 4.0% copper starting 73.15 meters downhole (uncapped) and also intersected 0.30 g/t gold and 0.16% copper over 50.29 meters starting 114.3 meters downhole and 0.14 g/t gold and 0.23% copper over 16.76 meters starting 216.41 meters downhole and ended in mineralization; Hole GBD-029 intersected 0.88 g/t gold and 0.34% copper over 56.39 meters starting 97.54 meters downhole , including 21.34 meters grading 1.42 g/t gold and 0.43% copper star