Visionary submits Phase 2 drilling permits at Pt. Leamington; files permits for ~30,000 Ha
Key facts
- 75.8 m
- 0.45 % Cu
- PL-112
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| PL-112 | 248.2–324.0 m | 75.8 m | 0.45 % Cu |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
Visionary Advances on Multiple Fronts at Pt. Leamington: Phase 2 Drilling Permits Submitted; Prospecting Permits Filed for ~30,000 Ha Regional Land Package; Field Personnel Mobilized to Site PR Newswire Highlights Exploration Permit Applications filed for: Phase 2 Diamond Drilling at the Pt. Leamington VMS Deposit targeting deposit resource upgrade / expansion of the emerging Kraken Zone; two drill rigs planned.
Prospecting and Ground Geophysical Surveys over all 21 mineral licenses in the newly expanded ~30,000 hectare (300 km2) land package including the Lewis Lake area. Field Personnel Mobilized to begin ground truthing of target areas on newly acquired licenses and to prepare for the upcoming Phase 2 drilling program. Phase 1 Drilling - Mineralization in Every Hole Drilled in the Kraken Zone: including: 75.8 m of 0.45% Cu (PL-112); 41.5 m of 0.39% Cu including 7.5 m of 0.89% Cu (PL-118); and 52.7 m of 0.30% Cu (PL-115).
The Krake zone remains open. Regional Lewis Lake Targets: encompass multiple undrilled and partially-tested off-hole EM conductors, IP chargeability anomalies, and untested airborne targets in the Wild Bight Group, the host of the Pt. Leamington VMS deposit.  Billiton/BHP concluded the Lewis Lake area had an environment permissive to host a massive sulphide deposit similar to Pt.
Leamington. VANCOUVER, BC , June 4, 2026 /PRNewswire/ - Visionary Copper and Gold Mines Inc. (the "Company" or "Visionary") (TSX-V: VCG; OTCQB: VCGMF) is pleased to provide a comprehensive update on its 100% owned Pt. Leamington Project located in central Newfoundland, approximately 37 km by road / trails from Grand Falls-Windsor and 20 km from the provincial power grid.
This update summarizes Phase 1 exploration results, the application for Phase 2 drilling permits, and permits