Talisker reports 2026 mineral resource statement at Bralorne Gold
TORONTO, May 14, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“ Talisker ” or the “ Company ”) (TSX: TSK, OTCQB: TSKFF) is pleased to announce the updated Mineral Resource Estimate (“ MRE ”) at the Company’s 100% owned Bralorne Gold Project in southern British Columbia (“ Bralorne Gold Project ” or the “ Project ”). The MRE is reported in accordance with the Canadian Institute of Mining (CIM), Metallurgy and Petroleum Definition ‎Standards (2014) incorporated by reference in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“ NI 43-101 ”), and uses general procedures and methodologies that are consistent with industry standard practices, including those documented in the 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines. Highlights of the Bralorne Gold Project MRE: Combined Measured and Indicated Mineral Resources are estimated at 0.72 Mt at an average grade of 8.91 g/t gold .
The MRE includes Measured Mineral Resources of 21,900 oz of gold at an average grade of 10.04 g/t gold and Indicated Mineral Resources of 184,400 oz of gold at an average grade of 8.80 g/t gold . Inferred Mineral Resources are estimated at 11.23 Mt at an average grade of 8.73 g/t gold . The MRE includes Inferred Mineral Resources of 3,151,000 oz of gold .
A total of 141 orogenic veins that comprise the Project’s vein systems were included in the MRE. The MRE is exclusive of mined out material. Terry Harbort, Talisker’s President and CEO, commented, “This updated MRE represents a step-change for the Bralorne Gold Project increasing our global resource by 100% and validates our long-held view of the quality and size of the Bralorne district.
Congratulations to our Exploration and Resource modelling teams for delivering well be