Total Metals hits 38.20% Zn over 0.42 m, 3.59% Cu over 1.91 m at Electrolode
Key facts
- 7.2 m
- 7 % Zn
- EL-26-003A
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| EL-26-003A | 341.0–348.2 m | 7.2 m | 7 % Zn |
| EL-26-004 | 371.8–381.6 m | 9.8 m | 3.9 % Zn |
| EL-26-006 | 433.0–437.0 m | 4.0 m | 8.4 % Zn |
| EL-26-006 | 409.2–413.5 m | 4.3 m | 7.8 % Zn |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
June 22, 2026 – TheNewswire - Toronto, ON - Total Metals Corp. (“ Total Metals ” or the “ Company ”) ( TSX-V: TT ) ( OTCQB : TTTMF ) ( FSE : O4N ) is pleased to announce the results of the first ten drill-holes completed on its 8,408 metre, 25 hole winter drilling program at the Electrolode critical metals property , located in Northwestern Ontario (the “ Project ”) in early 2026 . The 3,300 hectare Electrolode property, located 69 km from Ear Falls, in northwestern Ontario hosts the Arrow Zone with a NI 43-101 compliant current Inferred Mineral Resource 1 with an effective date of June 1, 2025, containing 2.11 million tonnes averaging 0.66% Cu, 4.74% Zn, 17.92 g/t Ag and 0.66 g/t Au. Other zones have been identified and explored on the property by previous operators including those in the Copperlode area southwest of Arrow.
HIGHLIGHTS Arrow Zone New Arrow Zone intercepts better than average resource grade with subintervals returning exceptional zinc and copper values Hole EL-26-006 returned 8.40% Zn, 0.40% Cu, 0.35 g/t Au, 21.88 g/t Ag over 4.00 m core length for the Arrow Zone   Includes 20.05% Zn, 0.23% Cu, 0.33 g/t Au, 27.54 g/t Ag over 1.54 m containing an interval of 37.38% Zn over 0.73 m   Hole EL-26-006 also returned 7.81% Zn, 1.90% Cu, 0.72 g/t Au, 56.51 g/t Ag over 4.30 m core length for a zone in the hanging wall of the Arrow Zone   Includes 16.91% Zn, 3.59% Cu, 1.33 g/t Au, 116.77 g/t Ag over 1.91 m containing an interval of 38.20% Zn over 0.42 m   Hole EL-26-003A returned 7.00% Zn, 0.47% Cu, 0.25 g/t Au, 32.73 g/t Ag over 7.18 m core length for the Arrow Zone   Includes 20.14% Zn, 0.89% Cu, 0.37 g/t Au, 112.29 g/t Ag over 1.70 m   Hole EL-26-004 returned 3.85% Zn, 0.50% Cu, 0.19 g/t Au