Metals Creek drills 40.61 g/t Au over 2.6 m at Ogden Gold Project
Key facts
- 13.3 m
- 8.4 g/t Au
- TOG-26-75
- +1 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| TOG-26-75 | — | 13.3 m | 8.4 g/t Au |
| TOG-26-75 | 326.6–329.2 m | 2.6 m | 41 g/t Au |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
High Grade Gold Mineralization with Associated Strong Visible Gold 40.61 g/t Au over 2.6m including 152 g/t Au over 0.6m Thunder Bay, Ontario--(Newsfile Corp. - June 25, 2026) - Metals Creek Resources Corp. (TSXV: MEK) (FSE: M1C1) (the "Company" or Metals Creek)  is pleased to announce diamond drill results for one hole from the recently completed (See News Release: June 11, 2026) three hole diamond drill program at the Ogden Gold Project located in Timmins, Ontario. The Ogden Gold Project (See Fig 1) is a 50/50 Joint Venture with Discovery Mining Ltd. (" Discovery "), with the Company serving as the operator. This program entailed 3 diamond drill holes totaling 1233 meters(m) targeting the lower portion of the Thomas Ogden Zone (TOG) fold structure which has a shallow easterly plunge.
TOG is host to gold bearing flat lying quartz bearing/siliceous secondary structures as well as strongly altered conglomerates and felsites. The altered conglomerates and felsites host pyrite +/- arsenopyrite and local visible gold. High-grade gold mineralization within TOG has a strong preferential association with the TOG fold axis.
Drilling Highlights Include: 40.61 g/t Au over 2.6m including 152 g/t Au over 0.6m (TOG-26-75) Broad zone of mineralization with 8.43 g/t Au over 13.25m (See Table 1) Footwall felsic dike returned 0.58 g/t Au over 7.95m TOG-26-75 returned a downhole intercept (326.60 - 329.20m) of 40.61 grams per tonne (g/t) gold (Au) over 2.60 meters (m) including 0.60m (326.6 - 327.20m) of 152 g/t Au , with strong visible gold (See figure 2). A broad zone of mineralization (See Table 1) including lower grade material returned a downhole intercept of 8.43 g/t Au over 13.25m. This hole (See Schematic Cross Section Fig. 1) was designed to further define the down-plunge extent of the high-grade gold mineralization associated with TOG fold structure as well as test an are