TomaGold intersects 204.25 m at Berrigan Deep Zone
Key facts
- 204 m
- 2 % CuEqZn
- TOM-25-011EXT
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| TOM-25-011EXT | 553.9–758.1 m | 204 m | 2 % CuEqZn |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
Highlights Major intersection of 204.25 m grading 2.05% ZnEq (0.48 g/t AuEq) (from 553.90 m to 758.15 m) in extension hole TOM-25-011EXT, underscoring the scale of the mineralized system within the Berrigan Deep Zone, including: 31.31% ZnEq (7.38 g/t AuEq) over 2.40 m (from 554.40 m to 556.80 m) 5.93% ZnEq (1.38 g/t AuEq) over 4.60 m (from 681.55 m to 686.15 m) 5.90% ZnEq (1.38 g/t AuEq) over 7.45 m (from 697.05 m to 704.50 m) 4.62% ZnEq (1.08 g/t AuEq) over 14.40 m (from 591.00 m to 605.40 m) Additional high-grade intersections: Prior to reaching the Berrigan Deep Zone, the hole extension also intersected a zone grading 3.02% ZnEq over 12.45 m (from 498.30 m to 510.75 m), including 16.23% ZnEq over 1.40 m. In addition, the original hole TOM-25-011 had previously identified several higher-level zones of interest, including 14.14% ZnEq over 2.00 m (from 307.50 m to 309.50 m). Results pending for holes TOM-25-009EXT, TOM-25-010EXT, TOM-25-012EXT and TOM-25-013EXT: Mineralization was consistently observed in drill core recovered from the four other extension holes, for which assay results are pending.
Geological model validation: These results confirm the vertical continuity of the Berrigan Mine Project's polymetallic hydrothermal system and validate the modeled extensions at depth. Preliminary 3D model viewer: https://www.mininghub.com/3d/v/4zxSrVUh . TOMAGOLD CORPORATION (TSXV: LOT; OTCPK: TOGOF) (“ TomaGold ” or the “ Company ”) is pleased to announce assay results from the first of five extension holes, TOM-25-011EXT, completed as part of Phase 2 of its drilling program at the Berrigan Mine Project, located in the Chibougamau Mining Camp of Québec.
The extension of hole TOM-25-011 was designed to test modeled conductive plates at depth within the Berrigan Deep Zone. The hole, which reached a final depth of 834.70 m, i