Dynasty drills at Thundercloud, Ontario
Vancouver, British Columbia--(Newsfile Corp. - July 7, 2026) - Dynasty Gold Corp. (TSXV: DYG) (FSE: D5G1) (OTC Pink: DGDCF) ("Dynasty" or the "Company") is pleased to announce that the Company has commenced its 2026 Phase 1 drilling at its 100% owned Thundercloud property, located 47 km southeast of Dryden, Ontario. The drilling rig has been moved to the South Pelham target, where Drill-hole TC24-06, drilled on the boundary of the Induced Polarization (IP) chargeability anomaly, discovered mineralization six meters from the surface, returning 0.8 g/t over 22.5m. Two nearby follow-up holes drilled in 2025 also intersected near-surface mineralization.
Current drilling is being conducted in a southerly direction, targeting a mineralized extension to that found in the Pelham Zone, where a number of high-grade drill results were obtained by Dynasty (Refer to Table 1 and Figure 1 ). Table 1: High-grade drill holes from Dynasty's 2022 to 2024 drill programs.   Figure 1 : High-grade drill holes highlights in Pelham Zone. To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/7227/304220_0044dbb1a4d04a26_001full.jpg After completing test drilling in the South-Pelham chargeability anomaly, the drill will be moved to the Pelham Main Zone to test for high-grade gold feeder zones and possible down-dip extensions of the northeast-plunging higher-grade shoots (modeled using Seequent's Leapfrog software; see Figure 2 ), with the goal of increasing the existing NI 43-101 open-pit gold resource (refer to "About Dynasty Gold Corp." section).
Figure 2 : Pelham deposit north-easterly plunging, looking west. To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/7227/304220_0044dbb1a4d04a26_002full.jpg The objective of this year's program is to discover additional mineralization along the north-south corridor in the central parts of