Midland begins drilling program on Willbob gold project
MONTREAL, July 08, 2026 (GLOBE NEWSWIRE) -- Midland Exploration Inc. (“Midland”) (TSX-V: MD) is pleased to announce the start of its drilling and prospecting campaign on the Willbob project, wholly owned by Midland. The Willbob project covers several tens of kilometres of stratigraphy and structures that are highly favourable for gold. Highlights Commencement of a 24-hole drilling program on the Willbob project and the Kan sector, totaling 3,500 m; Acquisition of the Kan gold project announced by Midland in 2025, with numerous known gold occurrences on the project (see press release dated April 22, 2025).
Channel on Didgeridoo Zone grading 2.30 g/t Au over 8.95 m, including 3.56 g/t Au over 3.15 m (open to the NW) (see press release dated July 3, 2025). 2026 Fieldwork A 3,500-metre drilling campaign will be completed on the Ants, Ferricrete, Pump Pad Ridge, Canyon, and Didgeridoo areas of the Willbob project in July and August. The Canyon and Didgeridoo areas have never been drill-tested. The Ants area was previously tested by Midland with 9 drill holes, whereas the Ferricrete and Pump Pad Ridge showings (Kan area) were previously drill-tested by several companies, namely Kennecott Canada Inc, Virginia Mines Inc., and Barrick Gold, between 1990 and 2023.
In addition, a field campaign including prospecting and drill site preparation was conducted from June 6 to 17 on the Ants, Ferricrete, Pump Pad Ridge, Canyon, and Didgeridoo area. A total of 74 samples were collected during this campaign. Ants Zone Discovered on outcrop in 2018, the Ants mineralized zone is characterized by the presence of sulphides, mainly consisting of 1-15% pyrrhotite with traces (up to 1%) chalcopyrite.
These sulphides are disseminated or clustered in a quartz diorite host rock that is strongly altered to iron carbonates and albite and locally injected with quartz-carbonate veinl