ATEX intercepts 20 m of 4.10% CuEq in 78 m of 3.03% CuEq at B2B Breccia
Key facts
- 692 m
- 1.1 % CuEq
- ATXD23C
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| ATXD23C | 916.0–1608.0 m | 692 m | 1.1 % CuEq |
| ATXD31A | 1304.0–1834.0 m | 530 m | 0.71 % CuEq |
| ATXD31B | 1438.0–1846.0 m | 408 m | 0.88 % CuEq |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
35% of Assays Remain Pending for Phase VI Program Toronto, Ontario--(Newsfile Corp. - July 8, 2026) - ATEX Resources Inc. ( TSX: ATX ) ( OTCQX: ATXRF ) (" ATEX " or the " Company ") is pleased to announce additional drill results from the Valeriano Copper-Gold Project (" Valeriano " or the " Project ") in the Atacama region of Chile, including complete results from holes ATXD23C, ATXD31A, and partial results from hole ATXD31B. Phase VI drilling totaled a record of approximately 28,400 meters (" m "), exceeding the initial 25,000m program target. Approximately 65% of assays have now been released for the Phase VI drill program with remaining results expected through July.
Chris Beer, Interim President and CEO commented, "These results continue to strengthen our confidence in the continuity of the high-grade B2B breccia and its relationship to the underlying high-grade porphyry system. Hole ATXD23C adds significant high-grade mineralization at the southern boundary of the currently defined B2B Mineral Resource, while holes ATXD31A and ATXD31B demonstrate that the system remains open to the north. Previously reported results from hole ATXD19A indicate that the B2B breccia extends approximately 180m to the south where follow-up drilling will resume in September with the continuation of hole ATXD19B as part of our Phase VII program.
Collectively, these results improve our understanding of the geometry, continuity and scale of the B2B breccia while reinforcing our interpretation that the highest-grade mineralization forms part of a much larger porphyry system with significant growth potential. Based on drilling completed to date, the B2B breccia has now been traced over approximately 600m representing a 50% increase from the previously interpreted 400m strike length. With several holes ending in mineralization and approximately 35% of Phase VI assa