Metals Creek intercepts 115.51 g/t Au over 9.85 m at Ogden gold project, Timmins
Key facts
- 9.8 m
- 116 g/t Au
- TOG-26-76
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| TOG-26-76 | 296.9–306.8 m | 9.8 m | 116 g/t Au |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
Second Highest Grade Intercept to Date on Ogden Project 115.51 g/t Au over 9.85m including 356.85 g/t Au over 3.10m Thunder Bay, Ontario--(Newsfile Corp. - July 14, 2026) - Metals Creek Resources Corp. (TSXV: MEK) (OTC Pink: MCREF) (FSE: M1C1) (the "Company" or Metals Creek)  is pleased to announce high-grade gold assays for one diamond drill hole from the recently completed (See News Release: June 11, 2026) three-hole diamond drill program at the Ogden Gold Project located in Timmins, Ontario. The Ogden Gold Project is a 50/50 Joint Venture with Discovery Mining Ltd (" Discovery "), with the Company serving as the operator. This program entailed 3 diamond drill holes totaling 1233 meters(m) targeting the lower portion of a Thomas Ogden Zone (TOG) fold structure which has a shallow easterly plunge.
TOG is host to gold bearing flat lying secondary structures within strongly altered conglomerates and felsites with pyrite. High-grade gold mineralization within TOG has a strong preferential association with the TOG fold axis. TOG-26-76 returned additional high-grade gold mineralization (See Table 1: Individual Assays) with a downhole intercept of 115.51 grams per tonne (g/t) gold (Au) over 9.85m (296.95 - 306.80m) including 3.10m (301.85 - 304.95m) of 356.85 g/t Au (See Fig 1) and also including 0.50m (304.45 - 304.95m) of 2050 g/t Au , with very strong visible gold (See figure 2).
This hole was engineered to follow-up on a previously released (See News Release August 18, 2022) hole TOG-22-73 which returned a downhole intercept of 4.24 g/t gold over 5.61m within altered conglomerate and felsite units with strong albitization, silicification and quartz veining. TOG-22-73 is located 75m vertically below TOG-26-76. Hole TOG-26-76 encountered highly silicified felsite with associated quartz flooding