SAGA Metals intercepts 53.72% Fe2O3 at Trapper South, Radar Project, Labrador
Key facts
- 127 m
- 43 % Fe2O3
- R-0047
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| R-0047 | 106.1–247.4 m | 127 m | 43 % Fe2O3 |
| R-0011 | 58.1–153.3 m | 95.2 m | 39 % Fe2O3 |
| R-0013 | 9.5–121.0 m | 112 m | 37 % Fe2O3 |
| R-0018 | 44.7–115.0 m | 70.3 m | 43 % Fe2O3 |
| R-0045 | 76.9–148.3 m | 71.3 m | 48 % Fe2O3 |
| R-0022 | 62.0–92.6 m | 30.6 m | 49 % Fe2O3 |
| R-0024 | 112.0–203.0 m | 91.0 m | 49 % Fe2O3 |
| R-0025 | 141.3–223.0 m | 81.7 m | 41 % Fe2O3 |
Vancouver, British Columbia--(Newsfile Corp. - July 15, 2026) - SAGA Metals Corp.   (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) ("SAGA" or the "Company") , a North American exploration company focused on critical mineral discoveries, is pleased to report additional assay results from drill holes R-0047, -0048 and -0049 completed in 2026 as part of its ongoing maiden Mineral Resource Estimate ("MRE") diamond drill program at the Trapper Zone within the 100%-owned Radar Titanium-Vanadium-Iron Project near Cartwright, Labrador, Canada. The Trapper Zone forms part of an oxide corridor that includes the Falcon and Hawkeye Zones collectively covering 29 square kilometres (Figure 1). Figure 1: The Radar Property with the Dias QMAGT vertical gradient (Bzz) anomaly footprint shown in red (high-amplitude pixels only).
The QMAGT-imaged central oxide-layering corridor validated over 29 km 2 , encompassing the Trapper Zone, Hawkeye Zone, and the new Falcon Zone. To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/12336/305233_sagaimg1.jpg Trapper Zone Assay Highlights Analytical results received for three (3) additional diamond drill holes (R-0047 to R-0049) from the MRE drill program initiated in Q4 2025, delivering consistent broad intercepts of oxide mineralization. Key intercepts include: Hole R-0047: 126.8 m @ 42.84% Fe2O3, 5.43% TiO2, 0.306% V2O5 Including 68.4 m @ 46.81% Fe2O3, 6.17% TiO2, 0.335% V2O5 Hole R-0048: 92.3 m @ 42.46% Fe2O3, 5.38% TiO2, 0.304% V2O5 Including 16.3 m @ 53.72% Fe2O3, 7.29% TiO2, 0.431% V2O5 Hole R-0049: 100.3 m @ 42.97% Fe2O3, 5.39% TiO2, 0.316% V2O5 Including 26.5 m @ 53.91% Fe2O3, 7.22% TiO2, 0.431% V2O5 These results now bring the total MRE drill results to forty-two (42) diamond drill holes received to