Vizsla Copper drills 304.8 m of 0.48% CuEq at Thira, BC
Key facts
- 483 m
- 0.4 % CuEq
- TH26-148
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| TH26-148 | 9.0–492.0 m | 483 m | 0.4 % CuEq |
| TH26-154 | 13.2–486.0 m | 473 m | 0.4 % CuEq |
| TH26-159 | 12.0–298.0 m | 286 m | 0.23 % CuEq |
| TH26-168 | 153.0–479.0 m | 326 m | 0.2 % CuEq |
| TH26-166 | 114.0–459.0 m | 345 m | 0.17 % CuEq |
| TH26-163 | 228.7–406.0 m | 177 m | 0.31 % CuEq |
| TH26-155 | 211.0–454.0 m | 243 m | 0.21 % CuEq |
| TH26-164 | 189.0–468.0 m | 279 m | 0.18 % CuEq |
Canada NewsWire VANCOUVER, BC , July 16, 2026 /CNW/ -- Vizsla Copper Corp. (TSXV: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) (" Vizsla Copper " or the " Company ") is pleased to announce the remaining drill results from its recently completed, spring 2026 Phase 1 drill program at the Thira porphyry discovery (the " Thira Discovery ") at its Poplar Project, located in central British Columbia (the " Poplar Project "). HIGHLIGHTS Drill hole TH26-154 tested the northern extent of porphyry-related copper-molybdenum mineralization intersected in discovery hole TH25-138, and returned: 472.8 meters of 0.40% copper equivalent*  (0.26% Cu, 0.017% Mo, 0.87 g/t Ag, and 0.04 g/t Au, above a 0.10% Cu cutoff grade) from 13.2 meters down hole, including 304.8 meters of 0.48% copper equivalent*  (0.29% Cu, 0.022% Mo, 1.02 g/t Ag, and 0.05 g/t Au, above a 0.20% Cu cutoff grade) from 13.2 meters down hole, and including 45.0 meters of 0.58% copper equivalent* (0.42% Cu, 0.012% Mo, 1.29 g/t Ag, and 0.096 g/t Au, above a 0.30% Cu cutoff grade) from 48.0 meters down hole All drill holes at the Thira Discovery intersected zones of porphyry-related copper-molybdenum mineralization  and together define a footprint of approximately 800 meters by 900 meters. Follow-up Phase 2 drilling at Thira will target mineralization extensions across interpreted fault zones.
Emerging Camp Lake target:  Seven drill holes evaluated the Camp Lake target and defined a broad ~800 meter by 400-meter footprint of porphyry-related copper-molybdenum mineralization. Follow-up Phase 2 drilling at Camp Lake will target higher-grade mineralization to the south. Emerging Copper Pond target:  Four drill holes evaluated the Copper Pond target and established a vertically oriented zone of copper-molybdenum-silver mineralization where 177.3 meters of 0.31% CuEq* (0.17% Cu, 0.012% Mo, 2.32 g/t Ag and 0.