Gold X2 intersects 26.65 m of 4.22 g/t Au at Moss Main
Vancouver, British Columbia--(Newsfile Corp. - August 10, 2026) - Gold X2 Mining Inc. (TSXV: AUXX) (OTCQB: GSHRF) (FSE: DF8) (" Gold X2 " or the " Company "), is pleased to announce the most recent assays from its ongoing infill and resource expansion drilling program targeting the Main and Southwest Zones at the Moss Gold Project in Northwest Ontario, Canada (the " Moss Gold Project ").
Michael Henrichsen, CEO and Director of Gold X2 commented: "We are pleased with the high grades encountered during our infill drill Campaign at the Moss Main Zone. As we continue to drill at the Moss Main Zone we have a better understanding of the geometry of high-grade shoots. The infill drilling at the SW zone is providing a better understanding of late brittle structures that the Company believes offset the Moss Deposit to the south-southwest. The collected structural information will be critical for developing an exploration model to find the continuation of the deposit to the SW over the coming months, alongside our ongoing geophysical and geochemical surveys along the Moss Extension Trend."
Highlights
Five holes were drilled at the Moss Main Zone as part of the ongoing resource infill campaign focused on converting existing inferred mineralization to indicated. Select results include: 41.6m of 0.86 g/t Au from 446.8m in MMD-26-406, including 8.0m of 2.87 g/t Au from 469.0m
29.0m of 1.00 g/t Au from 97.0m in MMD-26-407, including 17.45m of 1.37 g/t Au from 107.55m, and
51.95m of 0.98 g/t Au from 158.05m, including 5.4m of 4.67 g/t Au from 199.6m
26.65m of 4.22 g/t Au (4.85 g/t Au uncut) from 197.7m in MMD-26-415, including 10.9m of 9.02 g/t Au (10.5 g/t Au uncut) from 199.6m
Sixteen holes were drilled at the Southwest Zone, eight infilling existing drilling and eight targeting opportunities to expand the resource at depth and towards the southwest. The in