New Break drills 5.28 g/t Au over 11.2 m and 3.95 g/t Au over 14.0 m at Moray
Toronto, Ontario--(Newsfile Corp. - August 19, 2026) - New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) (" New Break " or the " Company ") has completed an additional 1,996 metres of drilling in 10 drillholes at its 100% owned Moray gold project (" Moray ") and is pleased to report assay results from the first six of these holes. Assays for the remaining four holes covering 1,198 metres are pending. In total, New Break has completed 5,372 metres of drilling in 32 drillholes in 2026. Moray is located 49 km south of Timmins, Ontario and 32 km northwest of the Young-Davidson gold mine operated by Alamos Gold Inc.
Highlights
Hole NBR-26-27 returned 5.28 g/t grams per tonne gold ("g/t Au") over 11.2 metres from 160.3 to 171.5 metres.
Hole NBR-26-28 returned 3.95 g/t Au over 14.0 metres from 150.0 to 164.0 metres, including 0.927 g/t Au over 2.5 metres in the syenite from 150.0 to 152.5 metres.
Hole NBR-26-28 also returned 0.53 g/t Au over 1.5 metres from 133.5 to 135.0 metres in the syenite.
Select results from the first six of ten drillholes from the Q3 2026 summer drilling program are presented in the following table:
Table 1 – Moray Q3 2026 Summer Drilling Program Select Drill Intercepts
(1) Intervals are drill intersections and do not necessarily represent true widths. (2) All intervals are presented using a cut-off grade of 0.3 g/t Au and internal dilution of no more than 2.0 metres at grades less than 0.3 g/t Au and assays are not capped (see QA/QC Procedures).
Drillhole collar locations from the first six of ten drillholes from the Q3 2026 summer drilling program are detailed in Table 2. There are no material drilling, sampling, recovery, or other factors known to the Company that could materially affect the accuracy or reliability of the assay data.
Table 2 – Moray Summer 2026 Drillhole Co