Wallbridge completes 2026 Fenelon PFS metallurgical drill program
Key facts
- 16.4 m
- 8.3 g/t Au
- FAL-26-002A
- +1 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| FAL-26-002A | — | 16.4 m | 8.3 g/t Au |
| FAL-26-001 | — | 2.1 m | 52 g/t Au |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
TORONTO, Sept. 02, 2026 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB: WLBMF) (“Wallbridge” or the “Company”) is pleased to announce final assay results from seven holes completed during the 2026 metallurgical drilling program at the Fenelon Gold Project. These results provide further confidence in the geological and grade continuity of the deposit while delivering the high quality of sample material needed to better characterize gold recovery characteristics and metallurgical performance across the Fenelon deposit. The drilling targeted areas considered for underground mining in the March 2025 Preliminary Economic Assessment (“ PEA ”) and provided representative samples for metallurgical characterization and variability testing in support of the Pre-feasibility Study (“ PFS ”) currently underway.
HIGHLIGHTS *
“The results from the 2026 metallurgical drilling campaign underscore the strength and continuity of gold mineralization within the areas of the Fenelon deposit contemplated for underground mining in the conceptual PEA mine plan,” said Brian Penny, CEO of Wallbridge. “While these holes were drilled primarily to provide representative material for metallurgical testing, they returned multiple significant gold intercepts, including several higher-grade intervals outside the current mineral resource estimate (“MRE”) as well as within zones specifically targeted for metallurgical testing. These results provide further confidence in the geological and grade continuity of the deposit while delivering the high quality of sample material needed to better characterize gold recovery characteristics and metallurgical performance across Fenelon as we advance the project toward its next major milestone, completion of the PFS in late 2027 or early 2028.”
2026 Metallurgical Drilling and Testing Program
The 2026 metallurgical testing program is a key compo