Gold X2 Drilling intersects 173.0 m of 0.89 g/t Au at QES
Key facts
- 173 m
- 0.89 g/t Au
- MQD-26-474
- +1 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| MQD-26-474 | 685.0–858.0 m | 173 m | 0.89 g/t Au |
| MQD-26-465 | 707.3–865.0 m | 158 m | 0.9 g/t Au |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
Vancouver, British Columbia--(Newsfile Corp. - September 10, 2026) - Gold X2 Mining Inc. (NYSE American: AUXX) (TSXV: AUXX) (FSE: DF80) (" Gold X2 " or the " Company ") is pleased to announce the most recent assays from its ongoing resource expansion drilling program targeting the depth extensions of the QES Zone at the Moss Gold Project in Northwest Ontario, Canada (the " Moss Gold Project ").
Michael Henrichsen, CEO of Gold X2 commented, "These results reinforce the potential to expand the open pit to depth and represent a meaningful opportunity to grow the current mineral resource at the Moss Gold Project. With 12 of the 21 planned holes in the QES resource expansion program now complete, we are continuing to define the scale and continuity of mineralization beneath the existing pit. Additional assay results are expected over the coming weeks as we advance this important resource expansion program."
Highlights
The first two holes of a twenty-one hole campaign at QES Deeps, drilled approximately 75 to 100 meters below the current RPEEE pit shell, have intersected wider than modelled mineralized core shear zones, suggesting potential for further deposit expansion at depth. These intercepts, including approximately 20m of internal waste, are: 227.2m of 0.73 g/t Au from 637.8m in MQD-26-465
271.6m of 0.73 g/t Au from 630.4m in MQD-26-474
The above broad bulk tonnage zones include higher-grade intercepts: 157.75m of 0.90 g/t Au from 707.25m in MQD-26-465, including 42.0m of 1.43 g/t Au from 744.0m, including 11.95m of 2.65 g/t Au from 790.05m
33.5m of 0.87 g/t Au from 630.4m in MQD-26-474, including 22m of 1.08 g/t Au from 631.0m
173.0m of 0.89 g/t Au from 685.0m in MQD-26-474, including 16.0m of 1.05 g/t Au from 696.0m
8.0m of 4.86 g/t Au from 721.0m
52.0m of 1.05 g/t Au from 767.0m
The current QES Drill Program is designed to both extend mineralization to d
Copyright (c) 2026 QuoteMedia, Inc.