Northmin hits positive metallurgical results at Tynagh
Key facts
- 27.4 m
- 10 % BaSO4
- 3615-26-07
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| 3615-26-07 | 90.5–118.0 m | 27.4 m | 10 % BaSO4 |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
The full release text is being published and will appear here shortly.
Copyright (c) 2026 QuoteMedia, Inc.