Errington Metals names Harold Gibson technical advisor, launches fall drill campaign
Key facts
- 7.2 m
- 5.1 % CuEq
- EMB-26-058
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| EMB-26-058 | 143.0–150.2 m | 7.2 m | 5.1 % CuEq |
| EMB-26-059 | 167.6–178.0 m | 10.4 m | 3.5 % CuEq |
| EMB-26-071 | 356.4–362.0 m | 5.6 m | 5.9 % CuEq |
| EMB-26-060 | 121.2–126.1 m | 4.9 m | 5.2 % CuEq |
| EMB-26-073 | 248.5–257.3 m | 8.8 m | 2.7 % CuEq |
| EMB-26-048 | 179.9–188.3 m | 8.3 m | 2.5 % CuEq |
| EMB-26-048 | 248.5–255.0 m | 6.5 m |
The full release text is being published and will appear here shortly.
Copyright (c) 2026 QuoteMedia, Inc.