Kobo Resources intersects 1.94 g/t Au over 19.0 m at Road Cut Zone
Key facts
- 9.0 m
- 24 g/t Au
- KDD0005
- +2 more
Drill results
| Hole | Interval | Width | Grade |
|---|---|---|---|
| KDD0005 | 40.0–49.0 m | 9.0 m | 24 g/t Au |
| — | — | 29.0 m | 6.4 g/t Au |
| KTR059 | 0.0–47.0 m | 47.0 m | 3.9 g/t Au |
| KTR049 | 1.0–34.0 m | 33.0 m | 4.7 g/t Au |
| KTR043 | 66.0–134.0 m | 68.0 m | 1.8 g/t Au |
| KTR070 | 2.0–30.0 m | 28.0 m | 4.4 g/t Au |
Intercepts extracted and reviewed by Strikepoint from the issuer’s filings. True widths may differ from downhole widths; see the full release for drill orientation.
Drilling confirms strong continuity of gold mineralisation within the Road Cut Artisanal Shear, while results from northern sections RCZ000 and RCZ-200 identify additional areas for follow-up drilling
KDD0191 returned 19.0 m at 1.94 g/t Au, including 9.0 m at 3.29 g/t Au, confirming continuity of mineralisation within the Artisanal Shear
Drilling on sections RCZ000 and RCZ-200 provides further evidence that the Road Cut gold system continues north into relatively lightly drilled areas
More than 53,430 m of drilling completed across 260 holes at Kossou, with additional high-grade results returned from the Kadie Zone
QUEBEC CITY, Sept. 29, 2026 (GLOBE NEWSWIRE) -- Kobo Resources Inc. (“ Kobo ” or the “ Company ”) ( TSX.V: KRI ) ( FWB: Q1Z ) is pleased to report diamond drill results from fourteen (14) additional holes completed at its 100%-owned Kossou Gold Project (“ Kossou ”) in Côte d’Ivoire. Six holes completed at the Road Cut Zone continued to extend and define gold mineralisation across multiple structures, including the Artisanal Shear, Main Road Cut Shear and Contact Zone Fault, with drilling providing further evidence that the mineralised system continues to the north. Eight additional holes tested shear and quartz-vein structures at the Kadie Zone, returning several high-grade gold intercepts.
Diamond Drill Results – Highlights:
Road Cut Zone:
KDD0191 19.0 metres ( " m”) at 1.94 g/t Au from 67.0 m, incl. 14.2 m at 2.44 g/t Au and 9.0 m at 3.29 g/t Au
4.0 m at 2.05 g/t Au from 134.0 m, incl. 1.0 m at 7.17 g/t Au
2.0 m at 2.91 g/t Au from 156.0 m
KDD0188 7.0 m at 1.28 g/t Au from 245.0 m
KDD0182 6.0 m at 1.17 g/t Au from 36.0 m
Kadie Zone:
KDD0192 9.0 m at 2.44 g/t Au from 62.0 m , incl. 2.0 m at 9.78 g/t Au
KDD0185 2.0 m at 9.26 g/t Au from 213.0 m
Ed
Copyright (c) 2026 QuoteMedia, Inc.